How to Run a Retainer That Closes Every Cycle
It is June, and March’s work is still waiting for the client to look at it. A project has a kickoff, a deliverable and a closeout. A retainer has no natural acceptance event, so unreviewed work and unused capacity bleed forward until the renewal conversation becomes an argument about hours.
-
The Sales-to-Delivery Handoff: What Must Move After Signature
The project manager’s first call opens with a question the client already answered in the pitch, and something quietly changes. The handoff moved the contract and left the context behind. Here is the pack that has to move with it, and why a gate works where a kickoff meeting does not.
-
Agency Pricing: How to Price Operational Risk, Not Just Hours
You quoted this scope last year and made money. Same scope, different client, and this time you are losing money on it. The difference was never in the deliverables. Here is how to read a client’s operating risk before you quote, price what you can predict, and refuse to fix-price what you cannot.
-
How to Recover a Failing Agency Project Before the Margin Is Gone
The project went green on Monday and red by Friday, and the founder has already decided to work the weekend. That decision was made before any thinking happened. Contain the bleed, calculate the exposure, then choose between continue, re-scope, pause and exit on the numbers, not the relationship.
-
Agency Operations Audit Checklist: What to Examine Before You Add More Process
Six people are busy, every one of them, and the same three projects have not moved in two weeks. An agency operations audit is not a review of your SOPs. It is watching how work moves and finding the one constraint that makes every other improvement irrelevant. Seven dimensions, run in a morning.
-
How to Build a Process Improvement Plan That Survives Live Client Work
It is week three, the new QA checklist is being skipped, and the person skipping it is the most reliable member of the team. That last detail is the diagnosis. Here is how to tell a design flaw from a behaviour problem, and how to install one repair so it survives a busy week.
-
What Is Rework in Agency Projects, and How Do You Reduce It?
The designer is redoing the homepage for the third time and nobody has changed their mind. Rework is work you already sold, done twice, and your tools cannot see it because they measure progress rather than quality. Here is how to classify it, count it, and find what causes it.
-
The Numbers You Need Before You Can Fix Anything
You ran the diagnostic, got to step two, and needed a number your agency has never once measured. Your tools record activity because that is what tools record. Flow, meaning how work moves, waits and comes back, is not in the data model. Six numbers, captured by hand, in two weeks.
-
Agency Capacity Planning: Buffer, WIP Limits and the Rule That Ends the Tiebreak
It is Tuesday, two clients need the same designer, and the only tiebreak the agency has is which client emailed most recently. Logged utilisation is a backward-looking metric being used as a forward forecast. Here is the forward view, the WIP limit, and the rule that takes it off your desk.
-
How to Take Four Weeks Off Without the Agency Slipping
Most founders have not been unreachable for two consecutive working days in years, and cannot say what would happen if they were. Absence is not the reward for having built a functioning agency. It is the only honest test of whether one exists. Start with a Tuesday and a Wednesday.